Based on the Design Framework agreement, Blue Projects provided Pre-Design and Conceptual Design services for the production relocation from Bournemouth to the Yeovil site in the UK.
Support Provided:
- Pre-Design Services
- Site Analysis: Conducted thorough analysis of the Yeovil site to determine suitability for production relocation.
- Feasibility Studies: Performed feasibility studies to assess the potential challenges and opportunities.
- Regulatory Compliance: Ensured all preliminary designs complied with relevant industry standards and regulations.
- Conceptual Design Services
- Design Development: Created initial conceptual designs for the new production layout at the Yeovil site.
- Integration Planning: Developed plans for integrating existing production processes into the new site.
- Cost Estimation: Provided high-level cost estimates for the relocation and setup at the new site.
Blue Projects ensured a comprehensive approach to planning and design, aligning with Honeywell’s strategic goals and operational needs. Our expertise facilitated a smooth transition, setting the stage for successful production relocation.