Services offered

Pre-Design Assessment, Concept Design

Location

United Kingdom

Time

January – February 2023

Client

Confidential

Based on the Design Framework agreement, Blue Projects provided Pre-Design and Conceptual Design services for the production relocation from Bournemouth to the Yeovil site in the UK.

Support Provided:

  1. Pre-Design Services
    • Site Analysis: Conducted thorough analysis of the Yeovil site to determine suitability for production relocation.
    • Feasibility Studies: Performed feasibility studies to assess the potential challenges and opportunities.
    • Regulatory Compliance: Ensured all preliminary designs complied with relevant industry standards and regulations.
  2. Conceptual Design Services
    • Design Development: Created initial conceptual designs for the new production layout at the Yeovil site.
    • Integration Planning: Developed plans for integrating existing production processes into the new site.
    • Cost Estimation: Provided high-level cost estimates for the relocation and setup at the new site.

Blue Projects ensured a comprehensive approach to planning and design, aligning with Honeywell’s strategic goals and operational needs. Our expertise facilitated a smooth transition, setting the stage for successful production relocation.